Field Manager

Posted on: 2012-05-07

NAME:                         Frantisek Ruzicka

\\r\\n

                                                           

\\r\\n

LANGUAGE:  English, Russian, Czech         

\\r\\n

             

\\r\\n

NATIONALITY:        Czech

\\r\\n

 

\\r\\n

 

\\r\\n

 

\\r\\n

Employment History:

\\r\\n

 

\\r\\n

December 2011 – so far

\\r\\n

NSN, Azerbaijan

\\r\\n

Azerfone SWAP and extension project

\\r\\n

3G support, Field Manager

\\r\\n

 

\\r\\n

    \\r\\n
  • Reporting to Project manager
  • \\r\\n
  • Managing of field activities as SWAP, implementation of SWAP sites
  • \\r\\n
  • Managing of supervisors for clean up, SWAP
  • \\r\\n
  • Creation of SWAP plans
  • \\r\\n
  • SWAP
  • \\r\\n

\\r\\n

 

\\r\\n

 

\\r\\n

March 2010 – October 2011

\\r\\n

NSN, Sweden

\\r\\n

Telenor SWAP project

\\r\\n

Field Manager

\\r\\n

 

\\r\\n

    \\r\\n
  • Reporting to Roll out and Project manager
  • \\r\\n
  • Weekly, daily customer meetings
  • \\r\\n
  • Weekly ,daily subcontractor meetings
  • \\r\\n
  • Managing of field activities as SWAP, installation,TSS
  • \\r\\n
  • Close cooperation with transmission and RF planning
  • \\r\\n
  • Approving of subcontractors PO
  • \\r\\n
  • Approving of TSSRs, Site folders
  • \\r\\n
  • Approving of weekly swap plans, adjusting of the plans
  • \\r\\n
  • Updating IPM on daily bases
  • \\r\\n
  • 3G flexi BTS, Ericsson TN on IP network
  • \\r\\n
  • Logistic of material for swap with DOP
  • \\r\\n
  • Implementation of EHS management and control
  • \\r\\n

\\r\\n

 

\\r\\n

 

\\r\\n

January 2009 – December 19th 2009

\\r\\n

NSN, Nigeria

\\r\\n

Regional BSS manager

\\r\\n

CW regional manager

\\r\\n

CW and TI Supervisor (new and old sites)

\\r\\n

         

\\r\\n

    \\r\\n
  • Reporting to CW country manager
  • \\r\\n
  • Managing of supervisor
  • \\r\\n
  • Customer meetings
  • \\r\\n
  • responsibility for PAC, refueling, clean up of 282 sites
  • \\r\\n
  • Subcontractor meetings
  • \\r\\n
  • Updating of E-PM
  • \\r\\n
  • Regional BSS manager
  • \\r\\n
  • following PAC,
  • \\r\\n
  • responsible for refueling all the sites in NSN region
  • \\r\\n
  • responsible for managing of all supervisor in region
  • \\r\\n
  • responsible for managing all riggers
  • \\r\\n
  • managing staff in region
  • \\r\\n
  • managing of CW supervisors for sites under construction
  • \\r\\n
  • managing of clean up of sites after PAC
  • \\r\\n
  • ordering and cancelling cars for NSN staff
  • \\r\\n
  • managing of databases
  • \\r\\n
  • managing of maintenance of generators for all sites belongs to NSN roll out
  • \\r\\n
  • managing of sites under construction, clean up, acceptance
  • \\r\\n
  • 12 sub cons
  • \\r\\n
  • Kick-off meetings with customer and subcontractors
  • \\r\\n
  • Building new sites
  • \\r\\n
  • Checking the specifications of the sites
  • \\r\\n
  • Weekly meetings with subcontractors
  • \\r\\n
  • Controlling of Detail Design, correction, final drawings
  • \\r\\n
  • Supervising of subcontractors on the sites
  • \\r\\n
  • Quality checks
  • \\r\\n
  • Final checking of sites, CAC acceptance, PAT acceptance
  • \\r\\n
  • PISM
  • \\r\\n
  • Updating E-PM
  • \\r\\n
  • TSS
  • \\r\\n
  • Flexi EDGE BTS(installation, commissioning, integration, cross connection, ABIS, troubleshooting)
  • \\r\\n
  • Supervision of TI installation of Flexi EDGE BTS
  • \\r\\n

\\r\\n

 

\\r\\n

 

\\r\\n

 

\\r\\n

 

\\r\\n

 

\\r\\n

October 2008 – November 2008

\\r\\n

Obelisk group, Ireland (Ericsson equipment)                       

\\r\\n

Commissioner (new and old links)        

\\r\\n

                                     

\\r\\n

    \\r\\n
  • Installation and commissioning  MINI-Link E,MINI-Link TN
  • \\r\\n
  • LOS
  • \\r\\n
  • Reports
  • \\r\\n
  • EHS training,ISO9001&ISO14001 standards
  • \\r\\n
  • Implementation of EHS management and control
  • \\r\\n

\\r\\n

 

\\r\\n

 

\\r\\n

         

\\r\\n

May 2007– August 2008      

\\r\\n

NSN, Iran                                   

\\r\\n

TI Engineer and CW Supervisor

\\r\\n

                                               

\\r\\n

    \\r\\n
  • Reporting to upper management
  • \\r\\n
  • Supervised and organized Subcontractors
  • \\r\\n
  • Supervising and Quality control of the installation of BTS,MW,BSC
  • \\r\\n
  • Commissioning and Integration of BTS and MW
  • \\r\\n
  • Supervising of fiber connections
  • \\r\\n
  • Supervising Antenna System installations and positions
  • \\r\\n
  • Tracing materials order and deliveries to sites
  • \\r\\n
  • Cross connections(HOP,BSC)
  • \\r\\n
  • Supervised, Organized and reviewed the works orders
  • \\r\\n
  • Organize equipment deliveries to sites
  • \\r\\n
  • Site audit for the Sector directivity, antenna ground level, RF and Mini Link antenna installations, RF and ML cable path installations, connectors
  • \\r\\n
  • RF Measurements of RF  path for Base Station and Mini Link by Site Master Anritsu
  • \\r\\n
  • Lead and supported the telecom implementation teams for the works of BTS, Mini Link and Power Supply commissioning and site integration on site
  • \\r\\n
  • Technical interface to customer
  • \\r\\n
  • Quality control check to prepare of Site Acceptance
  • \\r\\n
  • Responsible for rehomings
  • \\r\\n
  • Cell upgrade
  • \\r\\n
  • Kick-off meetings with customer and subcontractors
  • \\r\\n
  • Weekly meetings with subcontractors
  • \\r\\n
  • Controlling of Detail Design, correction, final drawings
  • \\r\\n
  • Supervising of subcontractors on the site
  • \\r\\n
  • Quality checks
  • \\r\\n
  • Final checking of sites, CAC acceptance, PAT acceptance
  • \\r\\n
  • PISM
  • \\r\\n

\\r\\n

 

\\r\\n

July 2006 – September 2006

\\r\\n

NSN, Bulgaria 

\\r\\n

Field Engineer

\\r\\n

 

\\r\\n

    \\r\\n
  • Reporting to upper management
  • \\r\\n
  • Site Surveys
  • \\r\\n
  • Making SDDR
  • \\r\\n
  • Nokia swap and 3G project
  • \\r\\n
  • Supervising of subcontractors on the site
  • \\r\\n

\\r\\n

 

\\r\\n

 

\\r\\n

    \\r\\n
  • Final checks, acceptance of sites
  • \\r\\n
  • Quality check
  • \\r\\n
  • PISM
  • \\r\\n
  • 3G training
  • \\r\\n

\\r\\n

 

\\r\\n

November 2004 –December 2005

\\r\\n

NOKIA, Ukraine           

\\r\\n

CW and TI Supervisor

\\r\\n

LOS Engineer

\\r\\n

 

\\r\\n

    \\r\\n
  • Reporting to project manager
  • \\r\\n
  • Supervised and organized Subcontractors
  • \\r\\n
  • Supervising and Quality control of the installation of BTS and MW
  • \\r\\n
  • Supervising Antenna System installations and positions
  • \\r\\n
  • Kick-off meetings with customer and subcontractors
  • \\r\\n
  • Weekly meetings with subcontractors
  • \\r\\n
  • Controlling of Detail Design, correction, final drawings
  • \\r\\n
  • Supervising of subcontractors on the site
  • \\r\\n
  • Quality checks
  • \\r\\n
  • Final checking of sites, CAC acceptance, PAT acceptance
  • \\r\\n
  • PISM
  • \\r\\n
  • Reporting to TRS planners and project manager
  • \\r\\n
  • LOS
  • \\r\\n
  • Reporting, site survey, TRS plans
  • \\r\\n

\\r\\n

 

\\r\\n

January 1997 –December 2003

\\r\\n

Ericsson Czech Republic

\\r\\n

TI&CW Supervisor, Team leader

\\r\\n

 

\\r\\n

    \\r\\n
  • Reporting to upper management
  • \\r\\n
  • Supervised and Organized work orders
  • \\r\\n
  • Attended and Reviewed the Site Surveys
  • \\r\\n
  • Tracing the equipment deliveries to site
  • \\r\\n
  • Supervised RBS Cabinet Installation, inspection of Feeder alignments and installations, inspection of Antenna orientation-sectors directivities, inspection and testing of AC and DC Supplies
  • \\r\\n
  • Supervised Mini Link-E, Mini Link-TN Magazine and  Cabling  Installations, Outdoor unit installation and antenna alignment inspection 
  • \\r\\n
  • Have done the fallowing tests: Antenna System Test, RBS Site Installation Test, Mini Link-E and Mini Link-TN Functional and Performance Tests
  • \\r\\n
  • Have responsible RBS (2000 Series) Commissioning and Integration, Mini Link-E and Mini Link-TN commissioning and bring to service
  • \\r\\n
  • Led and Supported  installation teams for technical work quality at site to prove ERICSSON Quality
  • \\r\\n
  • Technical interface to customer
  • \\r\\n
  • Cross connection on the links, BSC
  • \\r\\n
  • Rehoming
  • \\r\\n
  • DXX
  • \\r\\n

\\r\\n

 

\\r\\n

 

\\r\\n

    \\r\\n
  • Kick-off meetings with customer and subcontractors
  • \\r\\n
  • Weekly meetings with subcontractors
  • \\r\\n
  • Controlling of Detail Design, correction, final drawings
  • \\r\\n
  • Supervising of subcontractors on the site
  • \\r\\n
  • Quality checks
  • \\r\\n
  • Final checking of sites, CAC acceptance, PAT acceptance
  • \\r\\n
  • PISM
  • \\r\\n

\\r\\n

 

\\r\\n

Education and Qualifications:

\\r\\n

 

\\r\\n

Electrical Engineering College Pardubice, CZ

\\r\\n

Concentrated in Microwave, GSM and Telecommunications

\\r\\n

Software Skills: applications basis MS Office, AutoCAD

\\r\\n

Driving license:B

\\r\\n

 

\\r\\n

Professional Training:

\\r\\n

 

\\r\\n

    \\r\\n
  • Education Centre Sweden Certificate Ericsson
  • \\r\\n
  •  RBS 2206-Installation Delta/Site Test
  • \\r\\n
  • UltraSite BTS Installation & Commissioning: Nokia -2004
  • \\r\\n
  • Node B commissioning training: Nokia 2006
  • \\r\\n
  • Radio Network Planning Principles
  • \\r\\n
  • RF Measurement Applications, RF Loss & VSWR measurements using Site Master
  • \\r\\n
  •  MNI-LINK E, Traffic Node, High Capacity
  • \\r\\n
  •  RBS 2216-Installation and Installation Verification
  • \\r\\n
  •  CCNA in View
  • \\r\\n
  • Superior Performance in Team Leaders
  • \\r\\n
  • In House Training on CDMA 2000(1X) Installation
  • \\r\\n
  • Time and Priority Management
  • \\r\\n
  • Flexi BTS
  • \\r\\n
  • Implementation of IP network over Mini link TN
  • \\r\\n
  • Installation, commissioning and integration of Nokia Flexi multiradio and 3G BS
  • \\r\\n