PDMS 3D Piping Design Engineer

Posted on: 2009-11-21

Education & Trainings: \\r\\n1.Bachelor of Science in Refinery and Petrochemical Engineering\\r\\n2.International Computers School\\r\\n3.Certificate of Attendance in English Language\\r\\n4.PDMS 11.5 and 11.6 Training COURSE\\r\\n\\r\\nLanguages: \\r\\nENGLISH, FRENCH, ITALIAN, SPANISH.\\r\\n\\r\\nPC Skills: \\r\\nAutoCAD 2002, 2004, 2005, 2006, 2008 Bentley Auto PLANT Isometrics, Bentley Auto Plant Piping Version 2.0, Bentley Auto Plant Piping Version 3.0, Bentley Auto Plant Piping 2004, Bentley Auto Plant P&ID version 16.00, Bentley Auto Plant P&ID 2004, MAXIMO 5.2; Windows 2000, Windows XP, Microsoft Office, Easy Micro Station V8 and Unigrafix NX 4.0, Sketchup 0.5, Tribon M2 – Pipe Modeling and Drafting.\\r\\nPDMS piping, structure and equipments. COMOS version 8.2.\\r\\n\\r\\n\\r\\nExperinence no.1\\r\\nNovember 2009 – Present \\r\\nFunction: 3D PDMS Designer\\r\\nSC. Areva – NPP OL3 - Olkiluoto, Finland \\r\\n\\r\\nProjects Details:\\r\\nPenetrations position in 3D Nuclear Power Plant model for electrical scope.\\r\\nCable voltage tray routing. \\r\\n\\r\\n\\r\\nExperinence no.2\\r\\nApril 2008 – August 2009 \\r\\nFunction: PDMS - 3D Piping Designer\\r\\nSC. BWSC – Power Plant - Denmark\\r\\n\\r\\nProjects Details:\\r\\nGenerate isometrics, generate MTO reports, MDS support construction.\\r\\n3D Designing and supporting piping systems, structure and equipments.\\r\\n\\r\\n\\r\\nExperinence no.3\\r\\nOctober 2007 – March 2008 \\r\\nFunction: AutoPlant – 3D Piping Designer\\r\\nSC. NNE PharmaPlan - Denmark\\r\\n\\r\\nProjects Details:\\r\\nFirst Project: Design 3D model with AutoPlant for the construction and reconstruction of pharmaceutical factory in Perrino Espania. Modify the old piping system with the new roots, elements, equipments according with the requirement contractor and P&ID’s process. Generate isometrics of the pipes. Resolve issued of the old pipes system.\\r\\nSecond Project: Basic and detail designing of Urea Complex building for a new factory of Pronova in Kalundborg, Denmark. Generate isometrics for construction.\\r\\n\\r\\n\\r\\nExperinence no.4 \\r\\nMarch 2007 – September 2007 \\r\\nFunction: Designer 2 – piping system ship designer in TRIBON M2\\r\\nSC.\\r\\n\\r\\nProjects Details:\\r\\nDesign and drawing the documentation for projects, repairs, calculations and checking all the plans for the ships. Update in documentation by issue the revision, approval of documentation class and owners, specification for equipments and materials, analyze the offer for materials and equipments, specification analysis and annexed at contract.\\r\\nDesign, Preparation of fabrication drawings, Preparation of fabrication documents and work packages, Material control, Technical fabrication support, Technical follow-up towards vendors, Verification of mechanical completion, Commissioning and handover.\\r\\n\\r\\n\\r\\nExperinence no.5 \\r\\nSeptember 2001 – March 2007 \\r\\nFunction: AutoPlant Engineer, CAD Engineer, 3D Piping Designer\\r\\nSC. Rominserv SA.\\r\\n\\r\\nProjects Details:\\r\\nPiping engineering – 3D model, Process and Instrumental Diagrams - sketches, repair P&ID documentation, CAD drawings, 3D Modeling, Piping and Equipment, Link of isometrics drawings in MAXIMO 5.2, Bill of Material (BOM), Checking CAD drawings – isometric drawings product from 3D model, Maintain drawing files and 3D model – after revisions, Gather information from the plant court – site piper; Measuring and drawing of pipes, equipments and structures.\\r\\n\\r\\n