The Most Visited Job Board For Women For Over 20 Years
Hayward D. Anderson
Experience
October – February Lea & Braze Engineering Hayward, CA
Project Manager
Temporary assignment for Project Manager for schools projects to be modified for ADA compliance due to SF lawsuit. Residential project development, Tentative Map applications. Company downsizing after loss of several contracts due to economy.
Feb – Oct Stantec Consulting Bakersfield, CA
Project Manager
Hired specifically to handle a large scale project to get it back on track. The project is a plus acre subdivision called McAllister Ranch. The project has commercial/retail components with residential, parks and a golf course designed by Greg Norman. I manage client liaison, agency compliance, public hearings and planning commission meetings, contract negotiations a seven crew engineering staff with engineers, designers and drafters. I am tasked with project coordination with subconsultants, manufacturers, shop drawing review, site visit review to resolve construction conflicts, construction drawing review, mentoring of staff, project billing, lift station design, lot layouts, tentative map and final map processing, Due diligence and entitlement, project proposals and addendum, cost estimates and recommendations to client.
July – Feb New Faze Development Sacramento, CA
Project Manager
Responsible for all entitlement and agency liaison and correspondence with consultants and sub consultants including engineers, architects, contractors. Mainly to take project from conception to construction. Responsible for bids, advertising, scheduling, recordation of maps and signatures for improvement plans, and expensing the project for construction. Mainly responsible for the entitlement portion of processing the project for hand off to the construction manager to start of construction.
Feb – July HDA Consulting (Sole Proprietor)
Consultant
Responsible for all entitlement and agency liaison and correspondence with consultants and sub consultants including engineers, architects, contractors. Site Planning, site visualizations (of before and after), meetings with agencies, engineers and architects to review and comment on agency submittals, recordation of maps and signatures for improvement plans, scheduling and completion dates for getting project to construction. Clients included:
Sid Afshar
New faze development
CCS (California Cad Solutions)
Triple S ranch
June – Feb Riechers Spence Engineers & Associates Sacramento, CA
Project Engineer
Client contact and entitlement for new developments. Liaison between agencies and client. Due diligence for prerequisites of proposed projects and proposal writing. Getting new contracts and detailing proposed work and scope for proposals. Advising client of alternatives and best moves of processing entitlements through the agency. Planning Commission meetings. Recordation of maps and signatures for improvement plans. Supervision of design and preparation of layouts for designers and drafters for Tentative Subdivision Maps and construction drawings, SWPP, Lot mergers, Lot Line adjustments. Visualization of before and after for eminent domain by Flood Control Agency for lawsuit (client won before court, after visual)
Current projects in Jackson, Merced, Oroville, Amador County, Solano County, Vacaville, Napa, Sacramento, Dixon, Vallejo, Yuba City and Benicia. Projects are Condos, commercial, medical and residential subdivisions
Jan – Apr BKF Engineers Walnut Creek, CA
Project Engineer
Client contact and entitlement for new developments. Liaison between agencies and client. Due diligence for prerequisites of proposed projects and proposal writing. Getting new contracts and detailing proposed work and scope for proposals. Advising client of alternatives and best moves of processing entitlements through the agency. Planning Commission meetings. Recordation of maps and signatures for improvement plans. Supervision of design and preparation of layouts for designers and drafters for Tentative Subdivision Maps and construction drawings, SWPP, Lot mergers, Lot Line adjustments
City of Brentwood Police facility
Design and development of Police facility for the City of Brentwood (Onsite and Offsite Infrastructure). Offsite included, new storm drainage, Sanitary sewer system, water, fire supply, joint trench and improvement for existing drainage swale for storm water (built). Onsite, provided grading and paving plan, horizontal plan, coordination with subs (Landscaping, elect, mech, architectural) for utility connections and application for construction permit. Met with various agencies for getting proper standards, requirements and outline of facility development (i.e., Contra County Flood Control, Fire District, Sanitary Sewer District and City of Brentwood). Should start construction this year.
Napa - Kaiser
Design of Site for Kaiser facility in Napa. Coordination of utilities with various agencies and subs (same as indicated above on previous project). Provided Onsite detention in pipes due to inadequate existing storm water system.(built)
Diamond Hills - Calistoga
This is a project I took over that BKF had been working on since --a very complicated and political project that involved – , S.F. lots with , S.F. building envelopes. The project required a storage tank facility for fire and domestic water, a water pump station, a sewer pump station, onsite detention ponds, road improvements, coordination of final map, grading plan, erosion control plan (utilizing Best Management Practice - BMP), utility plan including separate water lines, retaining walls, numerous custom design details for the retaining walls, signage and striping plans, hydrology report and coordination with CalTrans because the entry to the property intersected with highway . This project grew from a plan set of drawings to -plan sheet set with the various disciplines.
Other projects include:
- schools for Contra Costa County
- A senior home facility in Fremont
- Streetscape for the City of Manteca (in progress
Nov – Aug ; May - Jan HDA Consulting Sacramento, CA
Proprietor
• Consultant for Ducks Unlimited – restoration of wildlife wetland habitats and earthwork
• Acton-Mickelson Environmental – Graphics for groundwater monitoring and hazardous waste materials
• Northwest Hydraulics – plans and specs for river improvements, FEMA studies for core of engineers
• El Dorado Hills Boulevard – Street Improvement Plans
• Fair Oaks Water District – Sheet Set of Plan/Profile Drawings for Water Main Replacement Project.
• Trinity River Bridge Replacement
• Earthquake Retrofit for rd Street Bridge & Berkeley
• Whiskey Creek Bridge
• Training has included: taking surveyors into the field to gather data, translating/reducing data
and converting data to useable topo. Conducted DCA training classes for all modules at Sacramento City College and for firms in the Sacramento and Bay Area.
• Consultant for development in Squaw Valley ( custom homes & condos); prepared site master plan, design of homes and condos
August /May Jacobs Engineering Sacramento, CA
CADD Manager
• Management of CADD, GIS and Graphics department; preparation of major excavation project at Avila Beach, CA; prepared excavation plan for project; relocation of facilities; managed and checked excavation procedures; attended strategy/kickoff meetings
Aug /Nov Nolte & Associates Sacramento, CA
Assistant Engineer
• Design and Drafting of Improvement Plans (Seven Miles) for the City of Lancaster and California Prison Facility
• The project required compilation of survey data (, survey points) and turning that data into a topo base map. The base map was then used to generate plan and profile, cross sections and earthwork calculations for the street improvement plans (-sheet set of x double plan and profile drawings.
• Design and Drafting of Water Transmission Main for the City of Coalinga
• The project required compilation of survey data (, survey points) and turning that data into a topo base map. The base map was used to generate plan and profile sheets (for a water transmission main).
Feb / Aug Omni Means Roseville, CA
Engineer
• Design and Drafting of Parking Facility for Sierra College
• Project required redesign of existing parking lot to provide more students parking. Grading, paving, and landscaping were additional services provided.
• Design and Drafting of Street Improvements for Rocklin Road for the City of Rocklin
• The project required compilation of survey data (, survey points) and turning that data into a topo base map. Base map was used for improvement plans.
• Design and Drafting of Street Improvement Plans for Quartz Drive for the City of Auburn.
• Created plan and profile sheets from surveyed topo data. Created contour
• mapping, from topo points, to produce construction drawings and earthwork calculations.
/ Nolte & Associates Sacramento, CA
Designer
• Design and Drafting of Water Main for the City of Vacaville
• Created plan and profile sheets for seven-mile stretch.
• Design of Intersection on Highway at Rancho Murieta
• Produced plan and profile maps along with contours for two-mile stretch of road.
/ Kennedy/Jenks/Chilton Sacramento, CA
Designer
• Design of wastewater/water treatment plants, water/sewer transmission mains. Supervisor of drafters and coordinator of all projects. Duties included distribution of workloads and ordering new equipment and supplies. Projects Included:
• Ione Prison Water/Wastewater Treatment Facilities
• City of Sacramento Water Storage Reservoir
• City of Vacaville Wastewater Treatment Plan Improvement Plans
• Linda County Wastewater Treatment Plant Improvement Plans
• Hazardous Waste Solid Investigation for Sacramento Train Yard
• Preparation of Numerous Soil Borings and Monitoring Well Graphics
References Available Upon Request