EXPERIENCE SUMMARY:


 


Extensive field and office Piping Design experience: including Detail Design, Construction, Supervisory and Management levels as well as; the coordination of design effort on projects, both in the Supervision of office and field personnel. The writing of piping and pipe support specifications (both fabrication and installation), work procedures and scope of work documents, scheduling of construction actives, estimating, piping bill of material take-off, manpower forecasts, vendor surveillance (requested by customer), and negotiating of subcontractor back charges. Work included existing plant modifications and grass roots projects, layout of equipment, piping systems, and supported piping field actives in the field as an office-engineering representative, a lead area Piping Engineer and for construction as Field Piping Engineer. Projects include Petrol Chemical, Power Plants (Nuclear, Fossil, and Co-Gen), Pharmaceutical, and Beverage Plants. A  working knowledge of Civil and Structural design, Piping Codes and Standards such as ASME, ASTM, ANSI, API, TEMA, OSHA, NFPA and MSS.


 


EDUCATION:


 


Mechanical Engineering, Widener College, Chester, PA (Not Completed)


Petrochemical Piping Design Apprentice Course, Catalytic Inc., Philadelphia, PA


Piping Design, JFK Technical School, Philadelphia, PA


 


 


KEY PROJECTS:


 


Dec. – Jun. , PegasusTSI, Inc.


ConocoPhillips Bayway Refinery


ISOM Rebuild Project


Roles and responsibilities include On-Site Project Engineering Manager for the Piping and Civil/Structural disciplines and administrative personnel for the Rebuild of the Isomerization Unit that caught fire providing technical direction, also released bid documents and scope of work packages for, piping, civil and structural, fireproofing, insulation and steam tracing.


 


Aug. – Dec. , PegasusTSI, Inc.


ConocoPhillips Bayway Refinery


Atmospheric Relief Project


Roles and responsibilities include On-Site Project Engineering Manager for the Cost Estimate of the site wide collection of Atmospheric Relief’s to a common Flare Header with the addition of Flares and Blowdown Tanks and related equipment and the addition of Cooling Tower. Organized and setup the site field office, supervised and directed personnel in the Piping, Civil/Structural, I&C and Electrical, disciplines, with the coordinating of all work with home office Process and Estimating Group (Est. M).


 


Jan. – Aug. , PegasusTSI, Inc.


Dolsal, UAI


Sulfar Storage and Handling Facility


Piping Design Group. Responsible for the piping layout and design of the Fire Water Pump House and Storage Tank using PDS. This was fill-in work until the COP Atmos. Relief Project was approved above.


 


Dec. – Jan. , PegasusTSI, Inc.


Momentive Corporation (formerly G.E.)


Roles and responsibilities include On-Site Team Leader for the PSM Remediation Group.  Organize and released work


packages for design resolution and bid packages, preparation of Article XXII document with work packages, prepare Bulk Material Quote documents and the ordering of material. Forecast all costs for the PSM work, track construction work and walk down construction work packages. Track Expense and Capital Costs against PO’s. Provide technical direction in a MOC review and tracking.  Assemble and issue all work packages.


 


Jun. – Dec. , PegasusTSI, Inc.


GE Plastics


Roles and responsibilities included identifying tie-ins to existing piping and all items to be demoed and reused, and the layout of platforming, piping, and equipment as well as; vendor correspondence and reviewing of all fabrication drawings, also, as a Liaison between the office and the owner’s I&E requirements. Some of the work included the Modification of two Polymer Blenders and associated piping, components and explosion vent to conform to the NFPA code and new design pressure. Reviewed the vessels and its components, design modifications, placed orders for equipment and expedited the equipment/material for construction. Duties also included the interfacing with piping and mechanical contractors for technical support.


 


Dec. – Jun.


Kinetics – New Berlinville, PA


Northeast Regional Detail Manager - Responsible for assigning work and the placement of detailers, ensuring all work was performed accurately and in accordance to Industry and Job requirements. Designed a database for the Bill of Material Take-Off of the Isos, in Access, to be used to place orders and the tracking of Material. An Isometric Tracking Log, in Excel, for a detail History of all Isometrics used on the Project and work percent complete status. Organized the Document Control System and trained personnel in its use. Test Forms and Work Packages to be used for Pressure and Steam–in-Place Testing for all Piping Systems. Scheduling, Estimating, Man Power Forecasting and Bid Proposals. Below are projects worked on.


 



  • Human Genome Sciences/Kinetics, New Berlinville, PA.


 



  • Amgen/Kinetics, and New Berlinville, PA.


 



  • Merck/Kinetics, New Berlinville, PA


 



  • Ben Venue/Kinetics, New Berlinville, PA


 



  • Wyeth/Kinetics, New Berlinville, PA


 



  • Rhodes/Kinetics, Coventry, RI


 


Nov. – Dec.


J.C. Higgins Corp., Stoughton, MA


CAD Operator - On-Site CAD Coordinator for a Mechanical Contractor developing detailed HVAC Mechanical Coordination Drawings, Piping Layouts, and Fabrication Cut Sheets for Boiler Room, Emergency Diesel Generators, Cooling Towers, and Crac Units using AutoCAD i. Also, the maintaining of all CAD and Network stations On-Site.


 


 


 


 


 


 


Mar. – Nov.


Jacobs Engineering Group, Houston, TX.


Sr. Piping Designer / Checker – Develop Equipment and Piping Layout of Raw / Reduced Crude Exchangers and Desalted / Reduced Exchangers. Checking of Reduced Crude Cooling System and miscellaneous support systems. Work was in an Existing Plant that required field verifications.


 


Jul. – Mar.


Raytheon Engineers & Constructors Inc. Houston, TX.


Senior Piping Designer/Construction Piping Field Engineer - Equipment and Piping Layout of Depentanizer Area and LPG Storage Area, Butane and Propane Bullets. Assigned to Construction as Field Piping Engineer at TransAmerican Refining Co., Norco, La.


 


Aug. – Jul.


Chart Coastal Fabrication, New Iberia, LA


Project Manager, Cold Box Fabrication Facility


The management of all Fabrication work to meet Scheduled Deadlines. Duties consisted of securing, Materials, Manpower, and Equipment for the Assembly, Testing, and Installation of all Piping, Electrical, Instrumentation, Structural Steel and the Technical Support of craft personnel, as well as any cost saving measures in the Fabrication of Cold Boxes.


 


Nov. – Aug.


Litwin Engineering Co., Houston, TX


Senior Piping Designer/Checker - Equipment and Piping One-Line Layout Drawings and Checking. Layout of equipment included a Splitter Column, a Reboiler and Condensate Pot with Pumps, Guard Bed, Inline Filter, Gas Heater and Cooler, K.O. Pot, Gas Compressor, Surge Drum with Vertical Pumps, and Compressor Suction Filters.


 


Jan. – Nov. , Process Systems International, Inc.


                                      Westborough, Ma.


Loral Space Systems, Inc. (Satellite Test Facility) - Palo Alto, CA


Assigned as a Mechanical Design Engineer. Duties included the development of Piping, Pipe Supports and Equipment Arrangement Drawings. Project Office and Field coordination of work activities and personnel.  Other duties include the writing of Specifications for Piping and Pipe Supports, the scheduling of Construction Activities, Field Liaison, and Vendor interface. The Project dealt with Liquid Nitrogen as the Process and the heavy use of Vacuum Jacketed Piping. I was sent by the client to the fabrication facility to oversee the fabrication and testing, because the schedule slipped, and to make improvements.  Improvements where instituted by my request and the schedule was met.


 


Jun. – Jan. , Process Systems International, Inc.


                                      Westborough, Ma.


Lyondell-Citgo Refinery, Houston, TX


(Marine Vapor Recovery Unit)


Assigned as a Mechanical Design Engineer and a Field Engineer. Worked on proposal packages for a SXP (Solvent Extraction System) and Cold Box. Checking of piping specifications, material and piping drawings. Cost estimates for mechanical design and installation for Marine Vapor Recovery Units. The preparation of company generic piping specifications.  Inputting of the piping specification and fittings into the piping ADAV computer program to use by the piping designers.


 


 


 


Apr. – Jun. , Process Systems International, Inc.


                                      Westborough, Ma.


Koch Refining Co., Corpus Christi, TX


Project Field Engineering representative, responsible for resolving all field related problems concerning all crafts.


 


Oct. – Apr. , Process Systems International, Inc.


                                      Westborough, Ma.


Hess Oil Refining Co., St. Croix, VI


Marine Vapor Recover Piping and Equipment layout.


 


Aug. – Dec. , SAE/Carlson, Cochituate, Ma.


Pepsi Cola Inc. Bottling Plant, Pakistan


(Part-Time) Consultant. Equipment and piping layouts. Updating of piping specifications. Cost estimates for mechanical design and installation for Pepsi Cola, Amchem, and Merck Chemical.


 


Mar. – Aug. , United Engineers & Constructors, Inc.


                                       Boston, Ma.


Millinocket Paper Mill, Millinocket, Me.


Field installation of SO vent fans.


 


Jan. – Mar. , United Engineers & Constructors, Inc.


                                       Boston, Ma.


MTI MW Cogeneration Project, Albany, NY


Design Supervisor, responsible for the supervision of designers, draftsman and AutoCAD operators in the development of, P&ID\'s, Plant and Equipment Layouts, pipe supports, and the coordination of the Electrical, Structural, / Civil, Mechanical Services, I&C, and Pipe Analysis Disciplines, and Manpower Forecasts and Staffing. Also, the field support for construction and startup.


 


Oct. – Jan. , United Engineers & Constructors, Inc.


                                       Seabrook, NH


MW Nuclear Power Generating Plant, Seabrook, NH.


Construction Field Piping Engineer. Responsible for the supervision of the field craft for the installation and field fabrication of piping and mechanical equipment for the plant licensing.


 


Apr. – Oct. , Harry Grosky Co.


                                       Springfield, Ma.


Pfizer Research Center, Groton, Ct.


Field Craft Coordinator, responsible for the coordination of work activities between the piping, electrical, and HVAC crafts.


 


Jan. – Apr.


HB Ski & Adventure, Exeter, NH


Owned and operated a Retail sporting store.


 


Jun. – Jan. , United Engineers & Constructors, Inc.


                                       Seabrook, NH


MW Nuclear Power Generating Plant, Seabrook, NH.


Lead Area Field Piping Engineer, responsible for the supervision of engineers, designers, and clerks. The responding of NCR\'s, FCN’s and RFI\'s. Wrote special work procedures and assigned to a special task force to resolve lining problems in piping and valves for the Seawater Cooling System.


 


 


 


 


 


 


Jun. – Jun. , United Engineers & Constructors, Inc.


                                       Richland, Wa.


WPPS Nuclear Project, Units &, Richland, WA.


Mechanical Piping Design Supervisor, Responsible for the supervision of designers, drafters, and clerks. The update of all mechanical piping drawings associated with the BOP and the answering of field problems. Later, appointed in charge of new group to develop isometric drawings for instrumentation tubing including supports.


 


Aug. – Jun. , United Engineers & Constructors, Inc.


                                       Philadelphia, Pa.


WPPS Nuclear Project, Units &, Richland, WA.


Piping Designer I - Design Supervisor. I was responsible for the development of layout of the equipment arrangement drawings and piping arrangement drawings for the BOP.


 


Apr. – Aug. , Allstate Design and Development Co.


                                       Philadelphia, Pa.


DuPont, Wilmington, DE.


Piping Designer I, responsible for the development of equipment arrangement and piping arrangement drawings.


 


Apr. – Aug. , General Design, Inc.


                                       Philadelphia, Pa.


Philadelphia Electric Co., Philadelphia, PA.


Piping Designer I. I was responsible for the site layout of eight combustion turbine units and all related equipment including the detail piping and the possible addition of a fossil plant with barge unloading facilities.


 


Aug. – Apr.


Certain-Teed Products Corp., Valley Forge, Pa.


Plant Engineering Dept.


Mechanical Piping Designer, responsible for the modification of the gas distribution system, at the Berlin, NJ Fiberglas plant.


 


Feb. – Aug.


Catalytic, Inc., Philadelphia, Pa.


Petrochemical Piping Dept.


Draftsman - Designer, responsible for the development of, P&ID\'s, Piping Arrangement drawings, Piping Isometrics drawings and Bill of Materials.


 


SOFTWEAR:


¨       MS WORD, MS EXCEL, MS ACCESS, MS POWER POINT, ACAD, PDS, SAP, SURETRAC.


 


 


LANGUAGE(S):


¨       English


 


 


* Hold a valid TWIC card.